Shizuoka Prefecture Construction Case Study: Reinforcement Method for Existing Rockfall Protection Fences - Easy Construction with Lightweight Materials
A construction method utilizing existing protective fences! We will introduce examples of partial elevation type construction.
Here is a case study of the "Stronger Method" implemented in Shizuoka Prefecture. As a result of the construction, the fence height increased from 2.0m to 3.0m, with a construction length of L = 27.0m. This method does not require the use of small heavy machinery, eliminating the need for surrounding tree removal. Additionally, the materials are lightweight, making the construction process simple. [Case Study] ■Partial elevation type (Fence height: H = 2.0 → 3.0m, Construction length: L = 27.0m) ■Shizuoka Prefecture (Construction: Fiscal Year 2018) *For more details, please refer to the PDF document or feel free to contact us.
- Company:ビーセーフ 本社
- Price:Other